Post-Construction Cleanup in Bothell, WA
Finish the project with a planned debris pickup after tools and active work have moved out of the loading path.

What this pickup can cover
- Bagged light cleanup waste
- Cardboard and packaging
- Lumber and trim offcuts
- Drywall and flooring scraps
- Ground-level roofing debris
- Approved mixed construction waste
Know the boundary before loading day.
This page describes debris hauling after construction. It does not promise janitorial cleaning, pressure washing, hazardous-dust remediation, asbestos abatement, or removal of unidentified regulated waste.
Prepare the access.
Remove tools from the route, consolidate loose waste, separate dense material, contain nails and sharp scraps, and identify anything wet, dusty, painted, or treated.

What changes an estimate
- Material type and whether it is mixed
- Pile dimensions and dense-material weight
- Stairs, gates, elevators, parking, and carry distance
- Loose dust, sharp edges, nails, or unstable stacking
- Requested timing and whether repeat pickups are needed